EUPE achieves a Qlassic score of 82% by implementing Novade on its residential project
By digitalising its handover process with Novade Quality, EUPE Corporation Berhad improved defect management, streamlined inspections, and achieved above-industry quality standards.
40+ units inspected using Novade
Streamlined digital handover process
Qlassic score of
82%
Instant feedback & faster rectification
Less paper, more
sustainable workflows
40+ units inspected using Novade
Streamlined digital handover process
Qlassic score of 82%
Instant feedback & faster rectification
Less paper, more sustainable workflows
Overview

PROJECT
- Name: Parc3 KL South
- Type: High-rise residential project
- Location: Kuala Lumpur, Malaysia
- Completion phase: Novade implemented six months before practical completion
- Key achievement: Achieved Qlassic score of 82%
ISSUES
- Manual site inspections required photos, handwritten notes, and paperwork back in the office
- Time-consuming defect reporting and follow-up
- Difficulties in tracking rectification progress across units
- Lack of real-time updates from site to management
CONTRACTORS
SOLUTIONS
GOALS
- Streamline and digitalise the handover process
- Improve traceability of defects and rectification
- Enhance communication between contractors and subcontractors
- Reduce paperwork and enable sustainable practices
- Achieve a high Qlassic score and deliver top-quality residential units
OUTCOMES
- Digitalised inspections with real-time photo and note capture
- 8,000 forms completed and submitted using mobile devices in real time
- Instant notifications sent directly to contractors and subcontractors for faster resolution
- Improved traceability of defects and repair progress across multiple units
- Reduced paperwork, contributing to sustainability goals
- Qlassic score of 82%, above industry average, proving enhanced product quality
Connecting the Seine to Paris
About EUPE

Construction director Antoine Cumunel commented, “I wanted to replace processes that generate paper. Managing paperwork takes a long time, you have to go back to the office, you have to write, sign, and scan it or create a distribution slip.”
Connecting innovation with Quality
Furthermore, the Novade digital construction app synced seamlessly with their documentation, BIM system and 3D plan. Roboam said, “Within two to three months of use, we managed to have a tool which totally corresponded to our needs. I find that in this situation, digital technology does not take precedence over the human, but it helps us carry out all the checks that must be done every day.”

“For me, the level of control has been strengthened. We found a tool that corresponded with all our needs.”
– Mathieu Roboam, Works Engineer, Eiffage Génie Civil
Going digital with Novade

“My role is made easier with Novade. Once we discover defects, we can just take pictures and click send. The information is instantly shared with the main contractor and sub-contractor for immediate follow-up. The entire process is smoother and more efficient.”
– EUPE Site Inspector
How Technology Enhanced Quality Management

“For Parc3, we achieved a Qlassic score of 82%. This is statistically way above the average of what the industry is achieving currently.”
– EUPE Management