EUPE achieves a Qlassic score of 82% by implementing Novade on its residential project
Large-scale residential project
82% QLASSIC score
40+ units inspected digitally
Real-time defect reporting
Instant feedback & faster rectification
Large-scale residential project
82% QLASSIC score
40+ units inspected digitally
Real-time defect reporting
Instant feedback & faster rectification
Overview

PROJECT
- Parc3 @ KL South – Award-winning high-rise residential project in Kuala Lumpur
- Completed in 2022
- Comprises 46 storeys with modern lifestyle facilities such as a sky garden, infinity pool, gym, and multipurpose hall
- Focused on enhancing residents’ quality of life through greenery, natural ventilation, and energy efficiency
GOALS
- Streamline and digitalise the handover process
- Improve traceability of defects and rectification
- Enhance communication between contractors and subcontractors
- Reduce paperwork and enable sustainable practices
- Achieve a high Qlassic score and deliver top-quality residential units
ISSUES
- Manual site inspections required photos, handwritten notes, and paperwork back in the office
- Time-consuming defect reporting and follow-up
- Difficulties in tracking rectification progress across units
- Lack of real-time updates from site to management
CONTRACTORS
SOLUTIONS
OUTCOMES
- Digitalised inspections for over 40 units using the Novade app
- Real-time defect reporting with photos sent instantly to contractors and subcontractors
- Immediate feedback and work progress updates via the app
- Reduced paper usage and eliminated manual report preparation
- Easy tracking of rectification status, repair timelines, and unit history
- Customisable workflows to suit project needs
- Qlassic score of 82%, above industry average, proving enhanced product quality
About EUPE
Challenges faced by EUPE

How EUPE raised quality standards with Novade
By adopting Novade Quality, EUPE transformed the way inspections and handovers were managed at Parc3. Engineers could record defects, capture photos, and share reports instantly from mobile devices, eliminating hours of manual paperwork. Contractors and subcontractors received updates in real time, accelerating rectifications and improving accountability.

Pioneering the future of construction

“With Novade, accessibility to the data was immediate and less paper was used during the process. ”
– Bernerd, Project manager, EUPE
EUPE’s success with Parc3 demonstrates how digitalisation is no longer just an option but a necessity for delivering top-quality developments. By embracing technology, EUPE has not only raised the bar for construction standards today but also positioned itself as a pioneer shaping the industry’s future in Malaysia. As projects grow more complex, digital tools like Novade will play a critical role in driving efficiency, transparency, and customer satisfaction.
Simon Sim, general manager of projects at EUPE said “With such a large-scale development like Parc3, documenting workmanship, quality and defects early is important. Novade proved to be a practical, efficient and simple app to use – customised to our project needs. Feedback was instant, data access immediate, and the process became smoother and more efficient.”